Charge air cooler installation, Cont’d e – Vortech 2005-2010 Ford 4.6L 3v Mustang GT User Manual

Page 60

Advertising
background image

P/N: 4FU020-010 v6.2, 06-08-10

©2010 Vortech Engineering, LLC

All Rights Reserved, Intl. Corp. Secured

38

Fig. 8E-a

Fig. 8E-b

Fig. 8E-c

8. CHARGE AIR COOLER INSTALLATION (

CHARGE COOLED KITS ONLY

), cont’d

E.

ENGINE COOLANT RESERVOIR

INSTALLATION (2007-2010 Models Only)

1.

Locate assembly 8N155-082.

2.

Attach the rear reservoir mounting bracket

4FU010-091 to the reservoir with the 1/4-20 x

1/2" long bolts and washers provided. (See

Fig. 8E-a.)

3.

Attach bracket 4FU010-061 to the front of the

reservoir with the hardware provided. (See

Fig. 8E-b.)

4.

Locate and install 1/4"NPT x 3/8" barbed fit-

ting in the tapped hole just above the previ-

ously installed mounting bracket. This hole

may have to be opened using the approppri-

ate drill bit. (See Fig. 8E-c.)

4FU010-091

RESEVOIR

BRACKET

8N055-080

OVERFLOW

TANK

Advertising