Rig the cabling, Check the assembly, Derig the array – d&b T-Series User Manual
Page 22
Advertising

5. Rig the cabling
- Connect the flying cables and link cables according to the number of
amplifier channels and cabinets used.
- Attach the cable pick depending on the chosen type of suspension
(Single or Dual pickpoint operation setup) as described in section 3.3
Suspension of the Flying frame on page 15.
6. Check the assembly
- Before hoisting the array to its operating position recheck the actual
status of the assembly according to the checklist given in section 5.
Checklist for the assembly of T-Series arrays on page 38.
7. Derig the array
- To lower the array and dismantle it, follow the assembly instructions
in reverse order. The same safety instructions apply.
T-Series Rigging manual
(1.1 EN)
Page 22 of 44
Advertising