Derig the ground stack, T-sub stacks – d&b T-Series User Manual
Page 37

7. Derig the ground stack
WARNING!
The total center of gravity of the T-SUB/T10 ground stack is
located close to the front of the stack.
To prevent the stack from tipping over while dismantling it we
recommend you to proceed as follows:
- Standing in front of the ground stack first release the Locking pins of
the Splay link of the first T10 cabinet and fold out the Splay link.
- Release the Locking pins for the Font links on both sides while holding
the cabinet.
- Remove the cabinet.
- Proceed in the same manner until all T10 cabinets are dismantled.
4.2.3. T-SUB stacks
Conventional T-SUB stacks are set up in the same manner as described
in the previous section 4.2.2 following step 1 on page 34. For
conventional ground stacks of T-SUB cabinets we also recommend
connecting the cabinets using their Rear links.
T-Series Rigging manual
(1.1 EN)
Page 37 of 44