Derig the ground stack, T-sub stacks – d&b T-Series User Manual

Page 37

Advertising
background image

7. Derig the ground stack

WARNING!

The total center of gravity of the T-SUB/T10 ground stack is
located close to the front of the stack.

To prevent the stack from tipping over while dismantling it we
recommend you to proceed as follows:

- Standing in front of the ground stack first release the Locking pins of

the Splay link of the first T10 cabinet and fold out the Splay link.

- Release the Locking pins for the Font links on both sides while holding

the cabinet.

- Remove the cabinet.

- Proceed in the same manner until all T10 cabinets are dismantled.

4.2.3. T-SUB stacks

Conventional T-SUB stacks are set up in the same manner as described
in the previous section 4.2.2 following step 1 on page 34. For
conventional ground stacks of T-SUB cabinets we also recommend
connecting the cabinets using their Rear links.

T-Series Rigging manual

(1.1 EN)

Page 37 of 44

Advertising