T-sub/t10 array, Preparations, Order of assembly – d&b T-Series User Manual

Page 25: Suspend the flying frame, Attach the t-sub cabinets, Prepare the first t10 cabinet, Attach the first t10 cabinet

Advertising
background image

4.1.3. T-SUB/T10 Array

WARNING!

For a mixed array consisting of T-SUB and T10 cabinets, the T-
SUB cabinets must always be positioned at the top of the array.

Preparations

- Prepare the flying cables and link cables according to the number of

amplifier channels and cabinets used.

- Ensure the HF sections of the T10 cabinets to be used are set to Line

source.

Order of assembly

1. Suspend the Flying frame

- Suspend the Flying frame according to the chosen type of suspension

as described in section 3.3 on page 15.

- Release the two Locking pins at the front of the frame.

2. Attach the T-SUB cabinets

Assembly of the T-SUB cabinets at the top of the array is carried out in
the same manner as described in the previous section 4.1.2 T-SUB
Column starting from page 23.

3. Prepare the first T10 cabinet

- Prepare the Front and Splay links of the first T10 cabinet as

described in section 2.4 on page11.

4. Attach the first T10 cabinet

- Release the upper Locking pin on the rear rigging strand of the last

T-SUB cabinet.

- On the rear hook the Splay link over the Locking pin of the T-SUB

cabinet.

- Lower the cabinet to enable the second Locking pin to be inserted.

- Insert the second Locking pin (safety pin) to secure the Splay link of

the cabinet.

T-Series Rigging manual

(1.1 EN)

Page 25 of 44

Advertising