Rig the cabling, Check the assembly – d&b T-Series User Manual
Page 36

- On the rear fold up the Splay link of the bottom cabinet and connect
it to the upper cabinet as follows:
- Lower the back of the upper cabinet until the Splay link
hooks over the preset Locking pin.
- Raise the back of the cabinet until the Splay link is
completely hooked into the Locking pin.
- Insert the second Locking pin (safety pin) to secure the Splay
link.
- To attach further T10 cabinets, proceed in the same manner until the
assembly is completed.
5. Rig the cabling
Connect the cables and link cables according to the number of amplifier
channels and cabinets used.
6. Check the assembly
Recheck the assembly according to the checklist given in section 5.
Checklist for the assembly of T-Series arrays on page 38.
T-Series Rigging manual
(1.1 EN)
Page 36 of 44