Rig the cabling, Check the assembly – d&b T-Series User Manual

Page 36

Advertising
background image

- On the rear fold up the Splay link of the bottom cabinet and connect

it to the upper cabinet as follows:

- Lower the back of the upper cabinet until the Splay link

hooks over the preset Locking pin.

- Raise the back of the cabinet until the Splay link is

completely hooked into the Locking pin.

- Insert the second Locking pin (safety pin) to secure the Splay

link.

- To attach further T10 cabinets, proceed in the same manner until the

assembly is completed.

5. Rig the cabling

Connect the cables and link cables according to the number of amplifier
channels and cabinets used.

6. Check the assembly

Recheck the assembly according to the checklist given in section 5.
Checklist for the assembly of T-Series arrays
on page 38.

T-Series Rigging manual

(1.1 EN)

Page 36 of 44

Advertising