1 receiving and unpacking the system – Artesyn Centellis 2000 Shelf - DC Installation and Use (June 2014) User Manual

Page 64

Advertising
background image

Site Preparation

Centellis 2000 Shelf - DC Installation and Use (6806800G45F)

64

2.2.1

Receiving and Unpacking the System

Carefully inspect the system and all components delivered together with it.

Shipment Inspection

To inspect the shipment perform the following steps:

1. Verify that you have received all items of your shipment.

Compare the shipment thoroughly with the delivery note.

2. Visually inspect the shelf to ensure that all of the connector pins are straight,

shrouds are properly seated, screws are tight, etc.

3. Check the rails for proper alignment.

4. Check that the air filters are properly installed.

5. Check that the cable connections are secure and properly fitted.

6. Check the EMI gaskets for damage.

7. Check the items listed above for damage and report any damage or differences to

the customer service at www.artesyn.com/computing/

Damage of Circuits
Electrostatic discharge and incorrect installation and removal of the product can damage
circuits or shorten their life.
Before touching the product make sure that your are working in an ESD-safe environment
or wear an ESD wrist strap or ESD shoes. Hold the product by its edges and do not touch any
components or circuits.

Advertising