Skip to step – Datalogic Scanning 9500 User Manual

Page 63

Advertising
background image

Set-Up & Installation

Product Reference Guide

2-35

4. Disconnect the Load Cell harness.

5. Move the Load Cell/Spider Assembly into position on the opposite

side of the scanner cavity and re-install the original screws. Torque
the screws evenly to 50 in-lb.

Figure 2-19. Locating the EAS Single-Antenna (Left-to-Right)

6. Route the Load Cell harness, re-bending it as indicated on the har-

ness, and reconnect.

7. Orient the EAS Antenna in the position indicated by

Figure 2-17

,

then route the antenna cable down through the unit’s side. Securely
attach the antenna using the screws provided.

8. Connect the antenna cable to the EAS Controller Box.

9. Re-install the platter.

This completes the EAS Single-Antenna location swapping procedure.

EAS Antenna

Product Flow

Product Flow

Load Cell/Spider

Assembly

Load Cell Harness

(bend for left-hand

scale installation)

The scale must be recalibrated upon completion of this proce-
dure, or upon completion of installation.

WARNING

DO NOT touch EAS Antenna coils inside of housing when in operation. Coils
generate over 500 VDC when activated.

LEGAL NOTE

Advertising
This manual is related to the following products: