Flowserve MX-100 Field Unit User Manual
Page 33
Advertising
33
MX/DDC-100 Field Unit Installation and Maintenance FCD LMENIM2329-01 – 03/11
flowserve.com
4. Apply heat shrink tubing to insulate the drain wire and to provide stress relief to the cable as shown in
Figure 3.5.
Figure 3.5 – Applying heat shrink tubing
CAUTION:
a
Do not melt the insulation.
NOTE: Ungrounded drain wires should be cut even with the cable sheath. The brand foil and drain wire should have
heat shrink tubing applied.
5. Install ring tongue connectors as shown in Figure 3.6.
Flowserve recommends the use of Thomas & Betts #RZ22-6 for optimum results.
Figure 3.6 – Ring tongue connectors
Advertising
This manual is related to the following products: