MX/DDC-100 Field Unit Installation and Maintenance FCD LMENIM2329-01 – 03/11

flowserve.com

Limitorque Tasks

Deliverable

From

To

Comments

Specifications

Engineer

Limitorque

Provide specification on Motor-Operated Valves, other DDC-100 Field Units (I/O

Modules). Provide P&IDs

Schedule

Contractor

Limitorque

Provide material delivery dates for hardware. Schedule Flowserve Limitorque

Controls Service Technician for actuator commissioning

Site Preparation

Contractor

Limitorque

Install specified equipment, cables for power, and network communication. Verify

all network and power cables are properly routed, terminated, and documented

prior to commissioning of DDC-100 Network. The contractor should provide

detail on network routing from Host system to each field unit. Verify all field units

are properly grounded

Operational

S.I.

Limitorque

Provide unique field unit requirements to Controls Service Technician

Requirements prior to start of field unit commissioning process. Include: ESD

requirements, open/close service or position control (“move-to”), digital inputs/

outputs, analog inputs

Tag List

S.I.

Limitorque

Provide a tag list detailing valve tag name to network address. This will allow the

Limitorque Controls Service Technician (when requested according to purchase

order) to properly address the actuators to the developed Host software

Sales Support

Limitorque

Engineer

Information on Limitorque products

Manuals

Limitorque

S.I.
Engineer
Contractor

Product Bulletins for Actuators:
• LMAIM4019 Direct-to-Host Programming Guide
• LMAIM1329 Accutronix Installation and Operation for MX-DDC Field Unit.
• LMAIM4029 DDC-100 UEC Field Unit (Modbus) Installation and Operation

Manual

• LMAIM4030 DDC-100 UEC Field Unit Installation and Commissioning Manual
• LMAIM4022 DDC-100 UEC Field Unit Wiring and Startup Guidelines
• Modicon Modbus Protocol Reference Guide PI-MODBUS-300 Rev. G (available

from Modicon)

Hardware

Limitorque

Contractor

Provide Motor-Operated Valves, RS-232/485 converters (if supplied), OEM

valves, mounting adapters, etc.

Field Unit

Startup

Limitorque

Contractor

According to purchase order requirements, when scheduled