3 skilled workers qualification, Skilled workers qualification – SMA SC 500HE-20 Installation User Manual

Page 12

Advertising
background image

2  Security

SMA Solar Technology AG

12

SCxxxHE-20-IA-IEN111210

Installation Manual

2.3 Skilled Workers Qualification

All work on the inverter may only be carried out by qualified technical personnel. Qualified means
that the personnel has the relevant training for the tasks.
For commissioning and operating the inverter, the personnel must be familiar with the installation
manual and the user manual. Observe safety instructions.

Advertising