6 switching on the voltage supply, Switching on the voltage supply, Ion 12.6) – SMA SC 500HE-20 Installation User Manual
Page 63
Advertising
SMA Solar Technology AG
12 Commissioning
Installation Manual
SCxxxHE-20-IA-IEN111210
63
12.6 Switching on the Voltage Supply
1. Close the test and disconnect terminals.
2. Switch on the miniature circuit-breaker of the grid
monitoring.
3. Switch on the miniature circuit-breaker of the
external voltage supply.
Advertising
This manual is related to the following products: