6 switching on the voltage supply, Switching on the voltage supply, Ion 12.6) – SMA SC 500HE-20 Installation User Manual

Page 63

Advertising
background image

SMA Solar Technology AG

12  Commissioning

Installation Manual

SCxxxHE-20-IA-IEN111210

63

12.6 Switching on the Voltage Supply

1. Close the test and disconnect terminals.

2. Switch on the miniature circuit-breaker of the grid

monitoring.

3. Switch on the miniature circuit-breaker of the

external voltage supply.

Advertising