2 preparing the station floor for installation, 2 drilling mounting holes in the station floor, Preparing the station floor for installation – SMA SC 500HE-20 Installation User Manual
Page 28: Drilling mounting holes in the station floor
Advertising
6 Preparation for Installation
SMA Solar Technology AG
28
SCxxxHE-20-IA-IEN111210
Installation Manual
6.2 Preparing the Station Floor for Installation
6.2.1 Position of the mounting holes for the Sunny Central
Before installing the inverter, prepare the mounting fixtures in the floor.
There are 4 mounting brackets in the base area of the inverter for anchoring in the foundation.
Figure 12: Position of the mounting brackets on the inverter
6.2.2 Drilling mounting holes in the station floor
1. Mark the positions of the mounting holes on the foundation corresponding to the mounting
brackets.
2. Drill mounting holes at the marked places in the foundation.
Position
Description
A
Mounting brackets
2 404 mm
16 mm
906 mm
773 mm
A
A
A
A
2 470 mm
2 510 mm
Advertising
This manual is related to the following products: