4 mounting the panels, 5 inserting fuses or disconnecting blades, Mounting the panels – SMA SC 500HE-20 Installation User Manual
Page 62: Inserting fuses or disconnecting blades, Ion 12.5
![background image](/files/819043/content/doc062.png)
12 Commissioning
SMA Solar Technology AG
62
SCxxxHE-20-IA-IEN111210
Installation Manual
12.4 Mounting the Panels
1. Fix all cables to the cable anchoring rail using cable ties.
2. Fasten the PE cables to the panels of the connection cabinet.
3. Check that the PE cables are securely fixed.
4. Screw on the Plexiglas cover over the AC terminal lugs.
5. Screw on the panels.
12.5 Inserting Fuses or Disconnecting Blades
1. If you are not using an SMB connection kit, insert fuses. To do this, use a LV/HRC fuse handle.
2. If you are using an SMB connection kit, insert
disconnecting blades. To do this, use a LV/HRC
fuse handle.
3. Screw the Plexiglas cover back on over the fuses.
%"/(&3
Risk of death due to electric shock when live parts of the inverter are touched.
• Do not touch live components in the central inverter.
HE