2 preparing the cable connection, Preparing the cable connection – SMA SC 500HE-20 Installation User Manual

Page 46

Advertising
background image

10  Cable Connection in the Connection Cabinet

SMA Solar Technology AG

46

SCxxxHE-20-IA-IEN111210

Installation Manual

10.2 Preparing the Cable Connection

1. Switch off the miniature circuit-breaker of the

external voltage supply.

2. Switch off the miniature circuit-breaker of the grid

monitoring.

3. Open the test and disconnect terminals.

4. Unscrew and remove the Plexiglas in front of the fuses.

Advertising