SMA SC 500HE-20 Installation User Manual

Page 33

Advertising
background image

SMA Solar Technology AG

7  Transporting the Sunny Central

Installation Manual

SCxxxHE-20-IA-IEN111210

33

3. Raise the crane hook slowly until the steel cables or

chains are tensioned.

4. Ensure that all steel cables and load hooks or load beams and shackles are attached correctly.
5. Raise the inverter slightly.
6. Transport the inverter to the installation site.

Advertising