Installation and Start-up

26

Pre-Power Check

9/15/93

❏ Remove any excess packing material.

❏ Check that all shipping devices and relay wedges have been removed.

Manually operate all contactors and relays to ensure that they move freely.

❏ Verify that all electrical connections are secure.

❏ Verify that all transformers are connected for proper voltage, according to the

drive system schematic diagram.

❏ Verify that the PG-X tachometer card is installed.

❏ Verify the EPROM inserted in the VCD 703 control board is labeled

according to the drawings supplied.

❏ Verify that all connections are made per the schematic.

❏ Verify that the three phase power connections are secure.

Figure 6. Voltage Selection in 460V VCD 723, 15HP and Above

FUSE

200V 380V 440V

220/ 400/ 460V
230V 415V

• •

CAUTION

Verify that incoming power IS NOT connected to the drive's
output terminals. (Terminals T1, T2, and T3). Improper
connection will cause severe damage to the drive when