Cr3 relay, Troubleshooting & repair, Voltmeter accuracy test – Lincoln Electric NA-5S User Manual

Page 112

Advertising
background image

F-59

TROUBLESHOOTING & REPAIR

F-59

4. Remove the jumper wire from leads

#2 and #4.

5. Remove the test voltmeter and,

while welding, compare the SET
volts and ACTUAL volts meter read-
ings. Depending upon the arc volt-
age characteristics of the process
being welded, the ACTUAL reading
may vary somewhat about an aver-
age value. The average ACTUAL
reading should match the SET read-
ing within +/- 0.5 VDC. If not, refer
to the

Meter Circuit Accuracy Test.

6. If no further tests are required,

remove all test equipment and close
and secure the access door.

VOLTMETER ACCURACY TEST

(Continued)

NA-5

FIGURE F.8 CR3 RELAY

CR3 RELAY

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

Advertising
This manual is related to the following products: