Paradyne 9128-II User Manual

Page 165

Advertising
background image

5. Operation and Maintenance

9128-A2-GB20-60

April 2002

5-9

ALM

(cont'd)

Operational
Alarm ( Fail)

Red

ON – FrameSaver unit has just been reset, or an
error or fault has been detected.

Alarms appear on the System and Test Status
screen. See

Table 5-7, Health and Status

Messages

, for additional information.

OFF – No failures have been detected.

TST

Test Mode

Yellow

ON – Loopback or test pattern is in progress,
initiated locally, remotely, or from the network.

OFF – No tests are active.

BKP

Backup

Yellow

ON – FrameSaver unit is in Backup mode; that
is, the backup link has been established, and
backup is in progress through the specified
Alternate Destination Link.

OFF – FrameSaver unit is not in Backup mode.

Blinking ON and OFF – Alternate Destination
Link is being established, but no data has been
passed.

FR
Mode

2

(Model
9128-II
only)

Frame Relay
Mode

Multi-
colored

Yellow – LMI is down on the FrameSaver
SLV 9128-II.

Green – LMI is up on the FrameSaver
SLV 9128-II.

Table 5-1.

General Status LEDs (2 of 2)

Label

Indiction

Color

What It Means

1

When an ISDN BRI DBM is installed, if the OK LED comes on then goes off during
power recycling, the ISDN BRI DBM may have failed.

2

On the Display LEDs & Control Leads screen for the Model 9128-II only, FR Mode
is On or Off. When On (highlighted), the FrameSaver unit is in Frame Relay mode.

Advertising
This manual is related to the following products: