Verifying isdn lines, Verifying that backup can take place – Paradyne 9128-II User Manual

Page 229

Advertising
background image

5. Operation and Maintenance

9128-A2-GB20-60

April 2002

5-73

Verifying ISDN Lines

Use either of the following methods to verify operation of the ISDN lines.

T

Check the status of the DBM interface:

Main Menu

Status

DBM Interface Status

Line Status should display Active. If an invalid (Inv) status appears (e.g., Inv
SPID for an ISDN BRI DBM) in the Line Status field, verify that you entered
ISDN physical options correctly.

T

Check the status of the unit:

Main Menu

Status

System and Test Status

Health and Status column

System Operational

should appear.

If

ISDN Network Failed

appears, check that both ends of the ISDN cable

are seated properly for a good physical connection. If that does not clear the
message, verify that you entered ISDN physical option information correctly,
then contact the network service provider.

See

DBM Interface Status

on page 5-38

, and

Table 5-7, Health and Status

Messages

, for additional status information.

Verifying That Backup Can Take Place

As each remote site is installed, verify its backup operation by unplugging the
network cable so the system is forced into backup.

T

Verify the ISDN lines by checking the DBM Interface Status.

Main Menu

Status

DBM Interface Status

Line Status should be Active. If an invalid (Inv) status (e.g., Inv SPID) is
displayed, verify that you entered ISDN physical options correctly.

T

Check backup setup and that data can be passed between DBMs.

T

Reconnect the network cable.

See

Table 5-7, Health and Status Messages

,

Viewing LEDs and Control Leads

on

page 5-4, and

DBM Call Performance Statistics

on page 5-66

, for additional

information.

Advertising
This manual is related to the following products: