Starting and stopping a test – Paradyne 9128-II User Manual

Page 256

Advertising
background image

6. Troubleshooting

6-20

April

2002

9128-A2-GB20-60

Starting and Stopping a Test

Use this procedure to start, monitor, or abort specific tests. To abort all active tests
on all interfaces, see

Aborting All Tests

on page 6-21.

Start or stop an individual test using the same procedure.

Procedure

To start and stop a loopback or a send-pattern test:

1. Follow this menu selection sequence:

Main Menu

Test

2. Select an interface and test (e.g., Network, Data Port, or ISDN PVC Tests) and

press Enter.

The selected test screen appears.

Start

appears in the Command column.

Inactive

appears in the Status column.

3. Select the Port number and press Enter.

4. Select the DLCI number and press Enter if a PVC test has been selected.

The cursor is positioned at Start in the Command column of the first available
test and is highlighted.

5. To start the test, highlight

Start

under Command for the test you want to run

and press Enter.

Stop

now appears and is highlighted, and the status of the

test changes to

Active

.

The length of time that the test has been running is shown in the Result
column.

6. To stop the test, press Enter to send the Stop command.

Start

reappears

and the status of the test changes back to

Inactive

.

When the status of a test is . . .

The only command available is . . .

Inactive

Start

Active

Stop

Advertising
This manual is related to the following products: