min.
max.
1
2
3
4
5
Fig. 14: Measurement setup in closed vessel with superimposed steam
1
Condensate vessel
2
Block valve
3
Precipitator
4
Drain valve
5
VEGADIF 55
à Mount VEGADIF 55 directly to the vessel
à Connect minus side always above the max. level
à The condensate vessel ensures a constant pressure on the minus
side
à For measurements in products with solid content such as e.g. dirty
liquids, the installation of separators and drain valves is
recommended to enable collection and removal of debris and
sediment.