background image

Fig. 65: Open vessel
I

VEGADIF 55

II

Precipitator

1

Drain valve

6

.7 Vent valves on VEGADIF 55

A

Block valve

Proceed as follows to prepare for the actual adjustment:

1

F

ill the vessel to just over the lower tap.

2

F

ill measuring system with medium.

O

pen valve A: Medium flows in.

3

V

ent instrument

B

riefly open valve 6, then close it: Fill the measuring instrument

completely with the medium and remove air.

4

S

et measurement loop to operation

N

ow:

V

alve B and 6 are closed

V

alve A open

5

C

arry out adjustment, see end of chapter "Level measurement"

VEGADIF

55

is used in all versions for level measurement in closed

vessels.

Note:
VEGADIF

55

in cell isolating diaphragm version is immediately ready

for operation.

VEGADIF

55

in flange version: After opening a probably existing block

valve, the instrument is ready for operation.

B

efore you adjust VEGADIF 55 in basic version, you have to clean the

effective pressure lines and the instrument must be filled with the

medium.

Closed vessel

VEGADIF

55 • 4 … 20

mA/HART

65

7 S

et up