Installationandcommissioning

- Always mount the device upstream a possible injection point in the pipe of a high-conductivity fluid (for

example: acid, base, saline,...).

Correct

flow direction

Incorrect

Correct

Incorrect

Fig. 10:

Air bubbles within the pipe

If necessary, use a flow conditioner to improve measurement precision.

7.2.2.

Installation into the pipe of a 8045 with a G2'' nut

In order to ensure a high accuracy of the measurements and good stability of the „flow zero“ point, install
the device into the processed medium at least 24 H before calibration.

1

2

3

5

4

6

FLOW

flow direction

Electrodes

Install the S020 fitting into the pipe taking into
account the recommendations in chap. “7.2.1”.

Check that there is a seal on the fitting and that it is
not damaged. Replace the seal if necessary.

Check that there is a seal (see mark 6, Fig. 11) on
the flow sensor.

Insert the nut (see mark 3, Fig. 11) on the fitting.

Insert the snap ring (mark 2, Fig. 11) into the
groove (mark 5, Fig. 11).

Position the device in order the arrow on the side of
the housing indicates the direction of the flow. the
totalizers will increment.

Insert the device (mark 1, Fig. 11) into the fitting.

Tighten the nut (mark 3, Fig. 11) by hand on the
device.

Fig. 11:

Installation into the pipe of a 8045 with a G2'' nut

7.2.3.

Installation into the pipe of a 8045 with a clamp connection

Observe the installation recommendations described at chap. 7.2. and in the operating instructions of the
S020 fitting.

In order to ensure a high accuracy of the measurements and good stability of the „flow zero“ point, install
the device into the processed medium at least 24 H before calibration.