Maintenance procedures, Maintenance procedures -93 – Luminex 100 IS Version 2.3 User Manual

Page 135

Advertising
background image

x

MAP Technology

Using Luminex 100 IS 2.3 Software

PN 89-00002-00-072 Rev. C

5 - 93

3. From the Restore Database From dialog box, select a database

backup file to restore and click Open. The system restores the
previously saved database. Notice that the files are organized by
date (month-day-year).

4. A Database Restored dialog box opens the next time you start

up the system. The dialog box prompts you to verify that the lot
information for CAL 1, CAL2, CON1, and CON2 reagents are
correct.

5. Click OK to verify that the lot information is accurate.

Maintenance Procedures

Table 5-11 shows a recommended schedule for maintenance
operations.

Table 5-11. Maintenance Operations:

Recommended Use Schedule

Operation

Recommended Use Schedule

Warmup

Daily

After four hours of system inactivity

Prime

Daily

To remove air from sheath fluid tubing

After performing these actions:

– refilling the sheath container

– removing and replacing sheath container

– changing the sheath fluid filter

– changing the syringe seal

Backflush

Troubleshooting and preventative
maintenance purposes only:

– to remove obstructions from the cuvette

– if fluid does not flow through the waste tub-

ing during prime cycles or during sample
acquisition

– if fluid drips from the sample probe during

priming and forms puddles of fluid on the
plate

Alcohol Flush

Daily

Before system calibration

After changing the sample probe

To remove air bubbles from the cuvette using
70% isopropanol or 70% ethanol

Advertising