Power-up sequence test, continued, Fault isolation procedures, Step g procedure condition action – Bendix Commercial Vehicle Systems VORAD EVT-300 TROUBLESHOOTING User Manual

Page 22

Advertising
background image

Fault Isolation Procedures

2-11

Power-Up Sequence Test, continued

Step G

Procedure

Condition

Action

1. Key off.

2. Disconnect Central Processing

Unit 32-way connector and Front
Antenna 4-way connector.

3. Measure resistance between:

• Central Processing

Unit 32-way
connector pin C3
and Antenna
4-way connector
pin 4.

• Central Processing

Unit 32-way
connector pin C3
and ground.

If resistance between pin C3 and
pin 4 is 0 to .3 ohms and if
resistance between pin C3
and ground is more than 10K
ohms or open circuit [OL]

If any of the above conditions
are not met

Go to Step H.

Repair OEM wiring harness between
Antenna and Central Processing Unit.
Go to Step V.

1

C

D

2

3

4

5

6

7

8

9

10

11

12

13

14

16

15

OHMS

V

A

COM

OHMS

GROUND

V

A

COM

1

2

3

4

1

C

D

2

3

4

5

6

7

8

9

10

11

12

13

14

16

15

Advertising