Power-up sequence test, continued – Bendix Commercial Vehicle Systems VORAD EVT-300 TROUBLESHOOTING User Manual
Page 26
Advertising
Fault Isolation Procedures
2-15
Power-Up Sequence Test, continued
Step K
Procedure
Condition
Action
1. Key off.
2. Reconnect Central Processing Unit
32-way connector.
3. Connect spare Front Antenna
to 4-way connector.
4. Key on.
5. Check error codes.
If no error codes
If error codes
Replace Antenna.
Go to Step V.
Replace Central Processing Unit.
Go to Step L.
Advertising