Power-up sequence test, continued – Bendix Commercial Vehicle Systems VORAD EVT-300 TROUBLESHOOTING User Manual

Page 26

Advertising
background image

Fault Isolation Procedures

2-15

Power-Up Sequence Test, continued

Step K

Procedure

Condition

Action

1. Key off.

2. Reconnect Central Processing Unit

32-way connector.

3. Connect spare Front Antenna

to 4-way connector.

4. Key on.

5. Check error codes.

If no error codes

If error codes

Replace Antenna.
Go to Step V.

Replace Central Processing Unit.
Go to Step L.

Advertising