Power-up sequence test, continued, Fault isolation procedures, Step i procedure condition action – Bendix Commercial Vehicle Systems VORAD EVT-300 TROUBLESHOOTING User Manual

Page 24

Advertising
background image

Fault Isolation Procedures

2-13

Power-Up Sequence Test, continued

Step I

Procedure

Condition

Action

1. Key off.

2. Disconnect Central Processing

Unit 32-way connector.

3. Measure resistance between:

• Central Processing

Unit 32-way
connector pin C5
and Antenna 4-way
connector pin 2.

• Central Processing

Unit 32-way
connector pin
C5 and ground.

If resistance between pin C5 and
pin 2 is 0 to .3 ohms and if
resistance between pin C5
and ground is more than 10K
ohms or open circuit [OL]

If any of the above conditions
are not met

Go to Step J.

Repair OEM wiring harness between
Antenna and the Central Processing
Unit. Go to Step V.

1

C

D

2

3

4

5

6

7

8

9

10

11

12

13

14

16

15

1

C

D

2

3

4

5

6

7

8

9

10

11

12

13

14

16

15

OHMS

V

A

COM

OHMS

GROUND

V

A

COM

1

2

3

4

Advertising