Startup – Rice Lake MA37 Sartorius Moisture Analyzer User Manual

Page 8

Advertising
background image

8

Startup

Operating Instructions Moisture Analyzer MA37

Startup

Unpacking and Equipment Supplied

t

Open the packaging, making sure to remove all parts carefully .

t

After unpacking the analyzer, check it immediately for any external damage .

– If you detect any damage, proceed as directed in “Care and Maintenance .”

– Save the box and all parts of the packaging for any future transport . During

shipment, please do not leave cables plugged in!

The following parts are included in the equipment supplied:

Moisture analyzer

Country-specific power cable

Pan support

Protective cover for the control panel

80 disposable aluminum sample pans

80 glass-fiber filters

Operating instructions

Choosing a Location

t

Select the proper setup location:

An optimal location guarantees accuracy and reliability . Ensure that the following
ambient conditions are met:
– Set up the analyzer on a stable, even surface that is not exposed to vibrations

(e .g ., weighing stone) .

– Maintain free access to the analyzer at all times .
– Make sure to choose a place where excessive heat cannot build up .
– Leave enough space between it and materials that are affected by heat .

Choose a location that is not subject to the following negative influences:
– Heat (heater or direct sunlight)
– Drafts from open windows, AC systems, and doors
– Extreme vibrations during measurement
– Heavy traffic areas (personnel)
– Extreme humidity
– Electromagnetic fields

Acclimatization
Condensation from humidity can form on the surfaces of a cold device when it is
brought into a substantially warmer area . You should therefore let a device that has
been disconnected from its power source acclimatize for approximately 2 hours
before reconnecting it to the power .

Advertising