Rice Lake TransAct 3.5 User Manual

Page 156

Advertising
background image

Accounting

Payments (TransAct Plus Only)

Version 3.5

157

Example: A landfill wants to track payments by material type. A check arrives from one of their

customers for $8,000.00. $3,000.00 is a payment for Solid Waste and $5,000.00 is for
Construction and Demo. This payment transaction would use the multiple item payment
option described above. Item 1 would be $3,000.00 with a material type of Solid Waste.
Item 2 would be $5,000.00 with a material type of Construction and Demo. The
statement will show a single payment of $8,000.00.

Adding Notes to a Receipt

The note fields used during weigh transactions can also be used when recording a payment. To open
the notes window, click the

Notes

button.

Figure 140. Payment Notes

To return to the payment detail window, click the

Details

button. To print these fields on the

receipt ticket, use the same field names as those for the weigh form (e.g.

Notes 1

,

Notes 2

, etc.).

Print Receipt when Saving

To use the print receipt option, a receipt file must be created and defined in the

Admin | Preferences |

Tickets

option box. The same procedures are used to create a receipt ticket file as a transaction ticket

file. When

Print Receipt when Saving

is turned on (an

‘x’

is placed in the box), a receipt will print to

the ticket printer only when the

Save

button is clicked.

To add additional items to an existing receipt, click the

Recall

button.

Advertising