3 standby function, 4 system preparation, 1 preheating – BUCHI KjelSampler K-377 User Manual

Page 35: 2 priming, 3 cleaning, 4 aspiration, Standby function, System preparation, 4 .3 standby function, 4 .4 system preparation

Advertising
background image

4 Description of function

35

K-375/376/377 Operation Manual, Version B

4 .3

Standby function

Press the key

READY to start heating the steam

generator.

Press the key

STANDBY to stop heating the

steam generator.

Fig. 4.6: Status view

After 30 minutes without operation, the heating of the steam generator is automatically turned off.
In this case „Standby“ is displayed on the Status view.
To activate the device press the

READY key. The steam generator will need 120 seconds for heating

up to the operating temperature.

4 .4

System preparation

4 .4 .1

Preheating

The glass parts of the distillation system have to be preheated prior to analysis. This is done by
means of a clean and empty sample tube. It is recommended to perform a preheating, when the
glass (splash protector) has cooled down. The preheating time is predefined and can not be adapted.

4 .4 .2

Priming

Priming is used to prepare the entire system. This preparation procedure includes distillation and
titration with a clean and empty sample tube. It is recommended to perform a priming at least once a
day, before starting analysis. The priming method can be modified.

4 .4 .3

Cleaning

At the end of a day, the system should be rinsed thoroughly by performing a cleaning procedure. The
splash protector and the condenser are rinsed with water to remove sodium hydroxide residues. With
regular cleaning, the lifetime of the glass parts can be extended. The cleaning method is predefined,
but can be modified and adapted to the size of the sample tube.

4 .4 .4

Aspiration

With this procedure residues in the sample tube and in the receiving vessel can be aspirated.

For more details see also chapter “6.6.1 System preparation”.

Advertising
This manual is related to the following products: