Load point connections, Junction box wiring, Dc power supply connection – Hardy HI 3010 Filler/Dispenser Controller User Manual

Page 34: Rear panel/load point connections, Junction box connections

Advertising
background image

HI-3010 Filler/Dispenser/IBC

18

Service Manual

FIG. 3-17 DC POWER SUPPLY CONNECTION

Step 1. Connect your positive and negative DC voltage

lines to the Phoenix connector that plugs into the
DeviceNet Connector. (See Fig. 3-17)

Step 2. Plug the connector into the DeviceNet Connector at

the rear panel.

NOTE:

Use DC power source when you have the -DC
option and do not have the DeviceNet Option.
The DeviceNet option has its own DC power
source.

Load Point Connections

FIG. 3-18 REAR PANEL/LOAD POINT CONNEC-

TIONS

C2

®

Load Point Connection

Cable color Code for C2 Load Points (left to right facing the
rear panel):

Shield

Ground Wire

C2-

Violet

C2+

Grey

EXC-

Black

SEN-

Brown

SIG-

White

SIG+

Green

SEN+

BLUE

EXC+

RED

Step 1. Remove the factory installed jumper from the ter-

minal block if you are connecting an 8 wire cable
from the junction box.

Step 2. Connect the cable (Recommended load cell cable:

Hardy Instruments Prt. # 6020-0001) wires to the J9

terminal block according to the cable color chart.
(See Below)

NOTE:

To purchase Hardy Load Cell cable, contact your
local Hardy Representative or Distributor.

Step 3. Plug the terminal block into the Channel 1 connec-

tor on the rear panel.

Non-C2 Load Point Connection

Cable color Code for Non-C2 Load Points:

Shield

Ground Wire

C2-

Not Used

C2+

Not Used

EXC-

Black

SEN-

Brown

SIG-

White

SIG+

Green

SEN+

Blue

EXC+

Red

Step 1. Remove the factory installed jumper from the ter-

minal block if you have 6 wire load cell cable that
includes sense wires from the load cell or junction
box.

Step 2. Connect the cable (Recommended load cell cable:

Hardy Instruments Prt. # 6020-0001) wires to the J9
terminal block according to the Non-C2 cable color
chart.

Step 3. Plug the terminal block into the Channel 1 (J9) con-

nector on the rear panel.

LVDT and Half Bridge Load Cells/Sensors

Please contact Hardy Technical Support for installation
instructions.

Junction Box Wiring

FIG. 3-19 JUNCTION BOX CONNECTIONS

Step 4. Connect the cable wires directly to the terminal

blocks according to the C2 or Non-C2 cable color
charts.

Step 5. Plug the terminal blocks into Channels 1 thru 4 con-

nectors on the rear panel. Write down which load
cell is connected to Channel 1, Channel 2, Channel
3, Channel 4 for future reference.

Advertising