Sequence of operation, Sequence of operation -4, Powermax – Hypertherm Powermax45 Service Manual User Manual

Page 80

Advertising
background image

TroubleshooTing and sysTem TesTs

5-4

powermax

45

Service Manual

Sequence of operation

Power OFF

• Connect the gas supply to the air fitting on the power supply.
• Connect the work lead to the workpiece.
• Plug in the power supply and make sure incoming power is ON if using a

line-disconnect box.

• Set the ON/OFF switch (S1) to ON (I).

• Set the power switch (S1) to OFF (O).

• The gas solenoid valve (V1) closes.
• The gas flow stops.

• The arc extinguishes.
• Gas continues to flow for 20 seconds.

• Drag the torch lightly across the workpiece to

make a cut.

• The workpiece drops after the cut.
• Release the plasma start trigger on the hand

torch or the remote start switch for the machine

torch.

• The gas solenoid valve (V1) opens.
• The gas flow starts.
• The cutting arc starts.

• Position the torch on the workpiece.
• Pull the plasma start trigger on the hand torch

or press the remote start switch for the machine

torch.

• The gas solenoid valve (V1) closes.
• The gas flow stops.
• The power circuits are ready.

• Turn the amperage adjustment knob to the gas test position.
• The gas solenoid valve (V1) opens to purge the system and to allow the

gas pressure to be set.

• The green power ON LED illuminates, indicating the system is ready for

operation.

• All the fault LEDs should be extinguished (see the Troubleshooting guide

on page 5-11 for more information).

• Verify that the gas pressure LED illuminates green and is centered in the

pressure bar.

• Set the amperage adjustment knob to the desired output current (between

20 and 45 amps) based on the thickness of the metal to be cut.

• Set the mode switch to the desired mode for cutting or gouging.

Advertising
This manual is related to the following products: