Rena T-950 User Manual

Page 27

Advertising
background image

SETUP & OPERATION

21

6. Remove enough labels to expose 29 to 30

inches of backing material. Then place the
stack on the Label Tray. Adjusts the Side
guide [4] so that it is within 1/16” of the
labels.

7. Thread the labels over the top of the Tray

and then down through the two guide rods
[5] as shown. Hook the Label Plate [6] over
the top guide and behind the lower guide, but
in front of the labels.

8. Then continue threading of the labels in the

machine per the “Loading Tabs” instructions.

9. To program the job, refer to the

“Programming the Job” instructions in this
manual.

Tip: When running labels, it is recommended that you run the tabber speed at 10,000 pieces per

hour or less.

Advertising
This manual is related to the following products: