Super Systems 9010 Series User Manual

Page 35

Advertising
background image

SSi Manual Series 9010 – eSPP Programmer

Page 35

GHDELAY

This opcode is a guaranteed high short delay opcode. Anything below the high limit will satisfy

the guarantee and allow the soak timer to run.

GHZDELAY

This opcode is a guaranteed zone high short delay. Anything below the high limit will satisfy

the guarantee and allow the soak timer to run. It is similar to the GDELAY opcode except that
zone instruments (if available) are included. If load TCs are enabled, the control TC must be
enabled to include the zone instruments. If the Control TC is disabled, the zone instruments will
not be evaluated.

GHZSOAK

This is a

Guaranteed Soak High

opcode for a zone. Anything below the high limit will satisfy the

guarantee and allow the soak timer to run. The option value is the soak time in hours and
minutes. The band limit can be changed by the

SET_WAIT

opcode.


GLDELAY

This opcode is a guaranteed low short delay opcode. Anything above the lower limit will

satisfy the guarantee and allow the soak timer to run.

GLZDELAY

This opcode is a guaranteed zone low short delay. Anything above the lower limit will satisfy

the guarantee and allow the soak timer to run. It is similar to the GDELAY opcode except that
zone instruments (if available) are included. If load TCs are enabled, the control TC must be
enabled to include the zone instruments. If the Control TC is disabled, the zone instruments will
not be evaluated.


GLZSOAK

This opcode is a guaranteed zone low short soak. Anything above the lower limit will satisfy

the guarantee and allow the soak timer to run. It is similar to the GSOAK opcode except that
zone instruments (if available) are included. If load TCs are enabled, the control TC must be
enabled to include the zone instruments. If the Control TC is disabled, the zone instruments will
not be evaluated.

GOSUB

The go to subroutine opcode is used to call a program and then return to the calling program.

This is used to execute standard routines that can be used by many programs.

GOSUBs

can be

stacked up to eight levels. The option data is the program number.

GTCINQDEL

This is a guaranteed TC inquiry short delay opcode. It is used to verify that all active

thermocouples are within the set wait limits around the setpoint for the user defined time period.
The temperature data is the delay time in seconds. The vacuum data is the control TC or the load
tc’s. The options are:

wait: the PV must be within the wait limit band specified to continue the recipe

wait up: the PV must be at or above the set point to continue the recipe

wait down: the PV must be at or below the set point to continue the recipe.

An explanation of wait, wait up, and wait down options can be found at the end of this chapter.

GZDELAY

This opcode is a guaranteed short zone delay. It is similar to the GDELAY opcode except that

zone instruments (if available) are included. If load TCs are enabled, the control TC must be
enabled to include the zone instruments. If the Control TC is disabled, the zone instruments will
not be evaluated.

GZRAMP

This is a

Guaranteed Ramp

opcode for a zone. The process value must be within the wait limit

band to allow the ramp timer to run. The temperature data is the temperature set point, the
atmosphere data is the atmosphere setpoint, and the option data is the ramp time in hours and
minutes. The band limit can be changed by the

SET_WAIT

opcode.