Ocx 8800, Instruction manual, Initial power up – Emerson ROSEMOUNT OCX 8800 User Manual

Page 43

Advertising
background image

Instruction Manual

IM-106-880, Rev 1.0
January 2007

3-3

OCX 8800

Figure 3-1. OCX 8800 Defaults

INITIAL POWER UP

Allow adequate time (approximately 60 minutes) for the heaters to begin
operation and for the OCX 8800 to reach normal operating temperature on
power up. Normal operating temperature for the O

2

cell is 736°C. Normal

operating temperature for the combustibles cell is 300°C. The normal sample
line temperature is 170°C. During this time the eductor air solenoid will remain
closed so no sample is pulled through the analyzer. When the OCX reaches
operating temperature the solenoid will energize, eductor air will begin to flow,
and the unit will begin normal operation.

1 2 3 4

Internal:

O 4-20 mA
is Internally

Powered

2

External:
O 4-20 mA
Requires an External
Power Supply
(Default)

2

O 21.1 mA/3.5 mA:

2

O 4-20 mA Signal
Rail Limits:
High - 21.1 mA
Low - 3.5 mA

2

COe 4-20 mA Signal
Rail Limits:
High- 21.1 mA
Low - 3.5 mA

COe 21.1 mA/3.5 mA:

1

1

2

2

3

3

4

4

SW3

3.5 mA

Switch

Default Postions

Shown

COe

SW1

SW2

37390026

O

2

21.1 mA

Closed

External:
COe 4-20 mA
Requires an External
Power Supply
(Default)

Internal:

COe 4-20 mA

is Internally

Powered

Open

Closed

Open

Open

Closed

Open

Closed

Advertising