Mounting and Wiring

Wiring Communication Links

Release F

UMC800 Controller Installation and User Guide

39

4/01

Installing ferrite clamp for CE compliance

This procedure ensures that unwanted radio frequency noise is filtered. It is required for CE compliance.

Parts needed

Part #

Quantity

Description

047260

1

Ferrite cable clamps

089037

2

Nylon cable ties

Installing ferrite clamp

Step

Action

1

Disconnect all power to the instrument.

2

See Figure 24. Attach the ferrite clamp around all the wires as close to the Configuration port
terminals as possible (within ½” of the terminals). For maximum shielding you must minimize
the amount of unshielded exposed wire. The ferrite clamp should overlap or abut the cable
shield enclosing the wires.

3

Snap the ferrite clamp closed, making sure to not pinch the wires.

4

To prevent the ferrite clamp from sliding, attach cable ties around the wires snugly against each
end of the ferrite clamp.

5

Trim the cable tie but leave a “tail” of approximately 1”.

Attach ties snugly
against each side of
the clamp.

Cable

Ter

m

in

al

s

Figure 24 Ferrite clamp installation