Nortel Networks Sun Fire V210 (RoHS) User Manual

Page 29

Advertising
background image

MCS 2-server Sun Fire V210 (RoHS) Solaris Installation and Commissioning Guide

29

Copyright © Nortel Networks Limited 2006

Figure 5 Back view of Sun Fire V210 server

Figure 6 Sun Fire V210 server cabling to layer-2 switch

Note 1: Net 0 and Net 1 are for redundancy. It is preferable
that each Ethernet port get cabled to a different layer-2 switch,
if available, for maximum redundancy.

Note 2: The two Ethernet switches are physically linked
together through either cascade modules or Ethernet links.

2

Plug in the power cords at the back of the V210 server.

ATTENTION

Do not power up the server at this time.

Advertising