Center pivot installation – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-751-G2 User Manual

Page 48

Advertising
background image

5. Assembly

48

PNEG-751-G2 12" Series II Sweep 131' and 135' Diameter

Center Pivot Installation

A. Center pivot with pivot kit

1. Use the pivot assembly supplied with the sweep pivot kit and cut it to fit, if needed.

2. Feed the multi-conductor cord through the hole in the back of the sweep head section leaving

five feet (5') of cord outside the hole.

(See Figure 5AH.)

Figure 5AH

CAUTION

The center pipe of the pivot assembly MUST be in the center of the bin. If it is
not, the sweep could hit the bin wall.

Advertising