Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-751-G2 User Manual
Page 50
5. Assembly
50
PNEG-751-G2 12" Series II Sweep 131' and 135' Diameter
8. Connect the 1" x 48" liquid-tight flex conduit to the pivot tube using one 1" conduit coupling and
one 1" liquid-tight flex conduit coupling.
9. Connect the 1" x 48" liquid-tight flex conduit to one of the junction boxes using one 1" liquid-tight
flex conduit coupling. Connect the leads as required.
10. The customer is to provide proper power cord protection between the pivot assembly and the
sump transition.
Figure 5AJ
11. The multi-conductor power cord can be connected with the 14 AWG/3 wire, 14 AWG/4 wire and
10 AWG/4 wire cords in an explosion proof junction box.
12. Hardwire foot switch to terminal 3 and terminal 4 in control panel.
(See Schematic on Pages 69-72.)
13. Hardwire motor thermostat J-wires to terminal 1 and terminal 2 in control panel.
14. Hardwire motors to starters in control panel.