DMU DIGITAL METERS UNIT FOR NXAMP

WARNING: NXAMP firmware should be at least LOAD3_11 for the DMU to work.

If not, the DMU view meters won’t work.

Connections and start up

Be sure that the host NXAMP is disconnected from mains.

Connect the four XLR-3 cables between DMU back panel XLR connector (from A to D)

and the NXAMP analog inputs (marked A to D).

If any network card is fitted, you will need also to connect the three RJ45 links between

the DMU back panel RJ45 and the network card ports.

WARNING: RJ45 links should be at least CAT5e to be compatible with Gigabit links

of the NXDT104.

We recommend following this color code bellow if possible:

RJ45 link color

Network port

RED IN/1/Primary

BLUE OUT/2/Secondary

GREEN Remote/3rd


Then connect the GPIO port of the DMU to the GPIO port of the NXAMP using a straight

DB25 male/male cable.

Connect the NXAMP mains plug(s) and turn the NXAMP “ON”. Check the LOAD revision

while booting up; it should be LOAD3_11 or above.

All LEDs will be on at startup for a short time, allowing an easy check that the unit is

correctly powered and that all LEDs are working. Then after a few seconds the view-meters

will represent the actual input level or analog and digital inputs, whereas the network LEDs

will show the network port status.

WARNING: NXES104 firmware should be at least 0x0D0E for the network LEDs to

work. The NXES104 firmware revision can be checked with ESmonitor™. To upgrade the

firmware of the NXES104 you will have to download the LOAD3_11 firmware (or above)

into the NXAMP fitted with this NXES104 through the IN or Remote port of this card.

If the view-meter does not work, check the GPIO setting of the NXAMP and ensure it is set

to MODE 0.