Test status symbols – In-Situ Win-Situ 4 / Pocket-Situ 4 Operators Manual User Manual

Page 52

Advertising
background image

52

0031510 rev. 003 11/04

The operations available depend on the status of the test selected in the
Navigation tree. A dfiferent symbol is displayed for each test status:

Test operations are initiated by action buttons in two places:

• the Tests view, where information about all tests is displayed and

actions may be performed on multiple tests

• a single Test view, where actions may be performed for the selected

test

Pending test—manual start
Completed test
Running test
Pending test—scheduled start
ABEND test
(came to an ABnormal END,
e.g., by losing power or filling the memory)

Test Status Symbols

SECTION 8: LOGGING DATA

Advertising