4 demand value measurement – KYORITSU 6300 Instruction Manual User Manual

Page 145

Advertising
background image

MODEL6300

13. 6

MODEL6300

Section 13 Specification

Section

13

13-4 Demand value measurement

(1) Target value (T

DEM

)

Display range

0.1W ~ 999.9GW (set value is fixed)

(2) Predicted value (G

DEM

)

Display range

0 ~ 999999dgt
* Decimal position, unit is same to T

DEM

.

Equation

erval

int

demand

of

beginning

from

Period

erval

int

Demand

DEM

Ȉ

G

DEM

×

=



(3) Demand value (present value) (

ȈDEM)

Display range

0 ~ 999999dgt
* Decimal position, unit is same to T

DEM

.

Equation

(

)

erval

int

Demand

hour

1

erval

int

demand

of

beginning

from

WP

DEM

Ȉ

×

+

=

¦

6

6

DEMi

DEM

*

1

i

: 1P2W(1ch)

*

2

,

1

i

: 1P2W(2ch), 1P3W, 3P3W

*

3

,

2

,

1

i

: 1P2W(3ch), 3P4W

(4) Load factor

Display range

0.00 ~ 9999.99%

Equation

DEM

T

DEM

6

(5) Setting item

Record interval

(Demand interval)

1/ 2/ 5/ 10/ 15/ 20/ 30sec. 1/ 2/ 5/ 10/ 15/ 20/ 30min. 1 hour

Start/ Stop

By manual operation or specifying start/ stop date and time

Demand
target value

0.1W ~ 999.9GW

Inspection cycle

Can select one of three preceding time to the set record
interval.
(e.g. When interval is 30min., select one from 10/ 15/ 20min.

when interval is 5min., select one from 30sec/ 1/ 2min.

* In case that the record interval is set to one of 1/ 2/ 5sec.,

setting for inspection cycle is not available.

* When G

DEM

>

T

DEM

is detected at each inspection cycle

,

buzzer sounds and backlight blinks.

Advertising