Report – WIKA Pascal 100 User Manual

Page 74

Advertising
background image

6 Commissioning, operation

74 WIKA Operating Instruction, Pascal 100 and Pascal 100/IS

GB

6.7

Report

To create a report one channel has to be set as REF (Reference) and another one as DUT (Device
Under Test
): reference signal and direct measurement (or manual input by keyboard) are required.
For the REFERENCE: remember to set the range equivalent to the one of the DUT. When the
channel is assigned as reference, the symbol REF will appear.
For the DUT: remember to define the max error and the declaration. A bargraph will be displayed
on the DUT channel. When the channel is device under test, the symbol DUT will appear.

Press REPORT, the below menu is displayed:
VIEW RPT

View Reports

SETUPRPT

Set up Reports

DEL.RPTS

deletes all the Reports

VIEW PRC

View Procedures

SETUPPRC Set up Procedures
DEL.PRCS

Delete all the Procedures

Figure 89

– Report menu


Press SETUPRPT to create a new Report.
Info required are:

Report name
DUT model (Device Under Test)
DUT Serial Number (Device Under Test)
Operator
Job Number
Found Left
Up Down
N. Points

Advertising