Pipe Sizing

Installation

Instructions

EXAMPLE

(Refer to Fig 2)

IMPORTANT: If exact length is not on chart, use next longer

length. Select the size of pipe that shows at least as much

capacity as needed for each piping section.

a. Section A to B of pipe must supply the complete gas

load of 1,500,000 BTUH for the entire building.

Looking at the 5 PSIG sizing chart, the size of pipe

used in conveying gas would need to be sized at 1

inch diameter pipe. Note that even though furthest

distance from first stage regulator to appliance is 230

ft., we use the 250 ft. length.

b. Section B to C must supply the load of 1,000,000

BTUH. Select 3/4 inch pipe for Section B to C.

c. Section C to D must supply a load of 750,000 BTUH.

Select 3/4 inch pipe for Section C to D.

d. Section D to E must supply a load of 500,000 BTUH.

Select 1/2 inch pipe.

e. Sections E to F must supply 250,000 BTUH. Select

1/2 inch pipe.

f. Sections B to C must supply 500,000 BTUH. Use 1/2

inch pipe.

g. The final section, G to H, needs only 250,000 BTUH

for gas usage. This section would use 1/2 inch pipe.

Fig. 2

EXAMPLE

Perform pipe sizing for building.

Total heat load is 1,500,000 BTUH.

Quantity 6 - 250,000 BTUH heaters.

Building is 300 ft. long x 40 ft. wide.

Section

BTUH

LP Gas Pipe Size

Gas Load

@ 5 PSIG

A - B

1,500,000

1 in.

B - C

1,000,000

3/4 in.

C - D

750,000

3/4 in.

D - E

500,000

1/2 in.

E - F

250,000

1/2 in.

B - G

500,000

1/2 in.

G - H

250,000

1/2 in.

First Stage Pipe Sizing

5 PSIG Inlet with a 1 PSIG Pressure Drop
Maximum capacity of pipe or tubing, in thousands of BTU/hr. of LP Gas

IMPORTANT: If exact length is not on chart, use next longer length. Select the size of pipe that shows at least as
much capacity as needed for each piping section.

Pipe Size

Length of Pipe or Tubing

(In Inches)

(In Feet)*

10

20

30

40

50

60

70

80

90

100

1/2

2946

2025

1626

1392

1233

1118

1028

957

897

848

3/4

6161

4234

3400

2910

2579

2337

2150

2000

1877

1773

1

11605

7976

6405

5482

4859

4402

4050

3768

3535

3339

125

150

175

200

225

250

275

300

350

400

1/2

751

681

626

583

547

516

490

468

430

400

3/4

1571

1424

1310

1218

1143

1080

1026

978

900

837

1

2956

2682

2467

2295

2153

2034

1932

1843

1696

1577

* Total length of piping from outlet of first stage regulator to inlet of second stage regulator (or to inlet of second

stage regulator furthest away).

August 1999