Component testing – L.B. White Pilot User Manual

Page 52

Advertising
background image

High Limit Switch Tests

Component

Testing

6.4-1

1

August 1999

Method oof TTest:

Disconnect the heater from its electrical supply before

conducting this test.

Remove the switch from its location. Hold the switch by one

of its legs with a pliers and apply a small flame only to the

sensing portion on the back side of the switch. Be careful

not to melt the plastic housing of the switch when

conducting this test. Within 1 minute, you should hear a

“pop” coming from the switch which indicates the electrical

contacts have opened.

Let the switch cool down for about 10 - 20 seconds before

firmly pressing the reset button on the switch. Check for

continuity across the terminals of the switch to make sure

the contacts are closed.

Reinstall the switch into the heater and reconnect heater to

its electrical supply.

ATTENTION

Model AB200 heaters incorporate a high limit switch with a

sensing capillary. To test this switch, run a small flame back

and forth along a 6 inch section of the capillary. Within 1

minute the electrical contacts of the switch should open.

You may leave the switch in mounted position to perform the

test.

Advertising