Disassembly, Disassembly -9 – JLG 450A_AJ Series II Service Manual User Manual
Page 221
Advertising
SECTION 4 - BOOM & PLATFORM
3121290
– JLG Lift –
4-9
Disassembly
1.
Remove capscrews (54) over end cap lock pins (53).
2.
Using a 1/8" (3.18mm) drill bit, drill hole in center of each
lock pin to a depth of approximately 3/16" (4.76mm).
3.
Remove lock pins using an ”Easy Out” (#2 shown).
If pin will not come out with ”Easy Out”, use 5/16" drill bit
to a depth of 1/2" (12.7mm) and drill out entire pin.
4.
Install end cap (4) removal tools provided with Helac
seal kit.
5.
Using a metal bar or similar, unscrew end cap (4) by
turning it counter clockwise.
6.
Remove end cap (4) and set aside.
Advertising