Disassembly, Disassembly -9 – JLG 450A_AJ Series II Service Manual User Manual

Page 221

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121290

– JLG Lift –

4-9

Disassembly

1.

Remove capscrews (54) over end cap lock pins (53).

2.

Using a 1/8" (3.18mm) drill bit, drill hole in center of each
lock pin to a depth of approximately 3/16" (4.76mm).

3.

Remove lock pins using an ”Easy Out” (#2 shown).

If pin will not come out with ”Easy Out”, use 5/16" drill bit
to a depth of 1/2" (12.7mm) and drill out entire pin.

4.

Install end cap (4) removal tools provided with Helac
seal kit.

5.

Using a metal bar or similar, unscrew end cap (4) by
turning it counter clockwise.

6.

Remove end cap (4) and set aside.

Advertising