Installing counterbalance valve, Installing counterbalance valve -18, Rotator counterbalance valve -18 – JLG 450A_AJ Series II Service Manual User Manual

Page 230

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-18

– JLG Lift –

3121290

Installing Counterbalance Valve

Refer to Figure 4-5., Rotator Counterbalance Valve.

1.

Clean actuator surface of contamination and foreign
debris including old Loctite.

2.

Make sure new valve has O-rings in counterbores of
valve to seal it to actuator housing.

3.

Bolts that come with valve are grade 8 bolts. Install new
bolts with a new valve. Apply Loctite #242 to shank of
three bolts during installation.

4.

Torque 1/4" bolts 110 to 120 in-lb (12.4 to 13.5 Nm).
Torque 5/16" bolts 140 in-lb (15.8 Nm).

Figure 4-5. Rotator Counterbalance Valve

Advertising