Installing counterbalance valve, Installing counterbalance valve -18, Rotator counterbalance valve -18 – JLG 450A_AJ Series II Service Manual User Manual
Page 230
Advertising
SECTION 4 - BOOM & PLATFORM
4-18
– JLG Lift –
3121290
Installing Counterbalance Valve
Refer to Figure 4-5., Rotator Counterbalance Valve.
1.
Clean actuator surface of contamination and foreign
debris including old Loctite.
2.
Make sure new valve has O-rings in counterbores of
valve to seal it to actuator housing.
3.
Bolts that come with valve are grade 8 bolts. Install new
bolts with a new valve. Apply Loctite #242 to shank of
three bolts during installation.
4.
Torque 1/4" bolts 110 to 120 in-lb (12.4 to 13.5 Nm).
Torque 5/16" bolts 140 in-lb (15.8 Nm).
Figure 4-5. Rotator Counterbalance Valve
Advertising