JLG 450A_AJ Series II Service Manual User Manual

Page 97

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3121290

– JLG Lift –

3-57

15.

Place manifold (7) over alignment studs and drive link
(10) and onto rotor set. Be sure correct manifold surface
is against rotor set.

16.

Apply grease to new seal ring (4) and insert it in mani-
fold seal ring groove.

17.

Install commutator ring (6) over alignment studs on
manifold.

18.

Install new seal ring (3) flat side up, into commutator (5).
Assemble commutator over end of drive link (10) on mani-
fold (7) with seal ring side up.

19.

Install new seal ring (4) in end cover (2) and install end
cover over alignment studs and on commutator set. If
end cover has only 5 bolt holes be sure cover holes are
aligned with 5 threaded holes in housing (18). Correct 5
bolt end cover bolt hole relationship to housing port
bosses is shown:

Advertising