Install new link, Install new link -23 – JLG 450A_AJ Series II Service Manual User Manual
Page 235
Advertising
SECTION 4 - BOOM & PLATFORM
3121290
– JLG Lift –
4-23
Install New Link
1.
Squeeze cut-out end of new link into half-shear (female)
end of track section.
2.
Spread half-shear (female) end of new link and slide cut-
out end of track section into it. Use a screwdriver if nec-
essary.
3.
After new link is installed round half-shears do not fit
properly in cut-outs.
Advertising