Install new link, Install new link -23 – JLG 450A_AJ Series II Service Manual User Manual

Page 235

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121290

– JLG Lift –

4-23

Install New Link

1.

Squeeze cut-out end of new link into half-shear (female)
end of track section.

2.

Spread half-shear (female) end of new link and slide cut-
out end of track section into it. Use a screwdriver if nec-
essary.

3.

After new link is installed round half-shears do not fit
properly in cut-outs.

Advertising