JLG 600SC_660SJC Service Manual User Manual

Page 103

Advertising
background image

SECTION 5 - HYDRAULICS

3120898

– JLG Lift –

5-17

lines as soon as oil is observed to leak from them.
When oil is observed to "leak" at the motor the line is
full, the air has been purged, and the system hoses
should be retightened to their specified torque.

Once charge pressure has been established, increase
speed to normal operating RPM. Charge pressure should
be as indicated in the pump model code. If charge pres-
sure is inadequate, shut down and determine the cause
for improper pressure.

INADEQUATE CHARGE PRESSURE WILL AFFECT THE OPERA-
TOR’ S ABILITY TO CONTROL THE MACHINE.

Shut down the engine and connect the external control
input signal. Also reconnect the machine function(s), if
disconnected earlier. Start the engine, checking to be cer-
tain the pump remains in neutral. With the engine at nor-
mal operating RPM, slowly check for forward and reverse
machine operation.

Charge pressure may slightly decrease during forward or
reverse operation. Continue to cycle slowly between for-
ward and reverse for at least five minutes.

Shut down engine, remove gauges, and plug ports.
Check reservoir level and add filtered fluid if needed.

The machine is now ready for operation.

Advertising